Fabrication of container sized packaged waste water treatment plant covering structure, piping, M&E and controls systems.
The SPLASHpro M1-80 and M2-80 systems was supplied and installed at the piles at LPG Jetty of Bintulu Port, Sarawak. The system is able to accommodate the irregular bracing and connections.
The SPLASHpro M2-80 system was supplied and installed at the piles of the LNG2, LNG3 and LPG Jetties of Bintulu Port, Sarawak. The project covering 1116 piles was given 36 months to complete given the high traffic volume of vessels berthing. The work was completed in 27 months.
The corrosion protection system of the splash zone covered 1116 nos. of steel piles in diameter of 508, 611, 711, 800 and 1100 mm. The SPLASHpro M-2 80 System comprised STACprime UW, STACfill, STACwrap UW (300 mm), STACguard, stainless steel bolts and nuts.
The SPLASHpro M1-80 system was supplied and installed at the steel piles of the Customs Jetty, Bukit Malut, Langkawi, Malaysia.
The SPLASHpro M-1 80 System comprised STACprime UW, STACfill, STACwrap (150mm & 300mm), STACguard, SS317L band (12.5mm/0.76mm) and SS316 Buckle.
The SPLASHpro M1-80 system was supplied and installed at the spun concrete piles of the passenger jetties of Pulau Ketam and Sungei Lima, Port Klang, Selangor, Malaysia.
The SPLASHpro M-1 80 System comprised STACprime UW, STACfill, STACwrap (150mm & 300 mm), STACguard, SS317L band (12.5mm/0.76mm) and SS316 Buckle.
The SPLASHpro M1-80 system was supplied and installed at the steel piles of the Beacon structures, off the coast of Kemaman, Terengganu, Malaysia.
The SPLASHpro M-1 80 System comprised STACprime UW, STACfill, STACwrap (150mm & 30 mm), STACguard, SS317L band (12.5mm/0.76mm) and SS316 Buckle.
The SPLASHpro M1-80 system was supplied and installed at the piles of the Beacon structure, off the coast of Johor, Malaysia.
The SPLASHpro M-1 80 System comprised STACprime UW, STACfill, STACwrap (150mm & 300 mm), STACguard, SS317L band (12.5mm/0.76mm) and SS316 Buckle.